ChargeCensus

Townhall EV Station 1

Available

EV charging station in Harwinton, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 303432.

At a glance

Townhall EV Station 1 is a public EV charging station at 100 Bentley Dr in Harwinton, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 26, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID303432
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 26, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
100 Bentley Dr
City
Harwinton
ZIP
06791
Coordinates
41.76419, -73.07009

Within ~15 km

Nearby charging

What kind of charging does Townhall EV Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Townhall EV Station 1 compare with other stations in Harwinton?

Harwinton has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Harwinton. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Townhall EV Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 26, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Townhall EV Station 1 have?

Townhall EV Station 1 has 2 charging ports: 2 Level 2.

Does Townhall EV Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Townhall EV Station 1 have?

Townhall EV Station 1 has J1772 connectors.

Is Townhall EV Station 1 open to the public?

Yes. Townhall EV Station 1 is listed with public access, and its status is available.

Where is Townhall EV Station 1?

Townhall EV Station 1 is at 100 Bentley Dr, Harwinton, CT 06791. Its coordinates are 41.76419, -73.07009.

More EV charging around Harwinton

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 303432, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Townhall EV Station 1, Harwinton, CT (AFDC station 303432)”, https://chargecensus.com/stations/connecticut/townhall-ev-station-1-303432 (data as of October 12, 2026).