ChargeCensus

Wittmann USA, Inc /Bas3599

Available

EV charging station in Torrington, Connecticut on the AmpUp network — 6 Level 2. US DOE AFDC station 319530.

At a glance

Wittmann USA, Inc /Bas3599 is a private EV charging station at 1 Technology Park Dr in Torrington, Connecticut, on the AmpUp network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 31, 2023.

Total ports
6
DC fast
0
Level 2
6
Access
Private
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID319530
NetworkAmpUp
StatusAvailable (E)
AccessPrivate
Open dateMay 31, 2023
Last updated at sourceOct 8, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
1 Technology Park Dr
ZIP
06790
Coordinates
41.84657, -73.08068

Within ~15 km

Nearby charging

What kind of charging does Wittmann USA, Inc /Bas3599 offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Wittmann USA, Inc /Bas3599 compare with other stations in Torrington?

Torrington has 14 charging stations in the DOE registry with 35 ports. Wittmann USA, Inc /Bas3599 accounts for 17% of the charging ports in Torrington. AmpUp runs 3 stations in Torrington. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Wittmann USA, Inc /Bas3599?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on May 31, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 8, 2026.

Frequently asked questions

How many chargers does Wittmann USA, Inc /Bas3599 have?

Wittmann USA, Inc /Bas3599 has 6 charging ports: 6 Level 2.

Does Wittmann USA, Inc /Bas3599 have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does Wittmann USA, Inc /Bas3599 have?

Wittmann USA, Inc /Bas3599 has J1772 connectors.

Is Wittmann USA, Inc /Bas3599 open to the public?

No. Wittmann USA, Inc /Bas3599 is listed with private access.

Where is Wittmann USA, Inc /Bas3599?

Wittmann USA, Inc /Bas3599 is at 1 Technology Park Dr, Torrington, CT 06790. Its coordinates are 41.84657, -73.08068.

More EV charging around Torrington

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 319530, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wittmann USA, Inc /Bas3599, Torrington, CT (AFDC station 319530)”, https://chargecensus.com/stations/connecticut/wittmann-usa-inc-bas3599-319530 (data as of October 12, 2026).