ChargeCensus

Fuel Cell Energy

Available

EV charging station in Torrington, Connecticut on the AmpUp network — 5 Level 2. US DOE AFDC station 415875.

At a glance

Fuel Cell Energy is a private EV charging station at 539 Technology Park Dr in Torrington, Connecticut, on the AmpUp network. It has 5 charging ports (5 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 24, 2024.

Total ports
5
DC fast
0
Level 2
5
Access
Private
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID415875
NetworkAmpUp
StatusAvailable (E)
AccessPrivate
FacilityOther
Open dateApr 24, 2024
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
539 Technology Park Dr
ZIP
06790
Coordinates
41.84145, -73.07793

Within ~15 km

Nearby charging

What kind of charging does Fuel Cell Energy offer?

Of its 5 ports, 5 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 63% above the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does Fuel Cell Energy compare with other stations in Torrington?

Torrington has 14 charging stations in the DOE registry with 35 ports. Fuel Cell Energy accounts for 14% of the charging ports in Torrington. AmpUp runs 3 stations in Torrington. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Fuel Cell Energy?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Apr 24, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Fuel Cell Energy have?

Fuel Cell Energy has 5 charging ports: 5 Level 2.

Does Fuel Cell Energy have DC fast charging?

No. The registry lists no DC fast ports here; its 5 ports are all Level 2.

What connectors does Fuel Cell Energy have?

Fuel Cell Energy has J1772 connectors.

Is Fuel Cell Energy open to the public?

No. Fuel Cell Energy is listed with private access.

Where is Fuel Cell Energy?

Fuel Cell Energy is at 539 Technology Park Dr, Torrington, CT 06790. Its coordinates are 41.84145, -73.07793.

More EV charging around Torrington

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 415875, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fuel Cell Energy, Torrington, CT (AFDC station 415875)”, https://chargecensus.com/stations/connecticut/fuel-cell-energy-415875 (data as of October 12, 2026).