ChargeCensus

Canton Ridge 1

Available

EV charging station in Canton, Connecticut on the AmpUp network — 6 Level 2. US DOE AFDC station 319327.

At a glance

Canton Ridge 1 is a public EV charging station at 3 Cherry Brook Rd in Canton, Connecticut, on the AmpUp network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 26, 2023.

Total ports
6
DC fast
0
Level 2
6
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID319327
NetworkAmpUp
StatusAvailable (E)
AccessPublic
Open dateSep 26, 2023
Last updated at sourceOct 8, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.40 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
3 Cherry Brook Rd
City
Canton
ZIP
06019
Coordinates
41.84000, -72.93000

Within ~15 km

Nearby charging

What kind of charging does Canton Ridge 1 offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.40 per kWh”.

How does Canton Ridge 1 compare with other stations in Canton?

Canton has 5 charging stations in the DOE registry with 14 ports. Canton Ridge 1 accounts for 43% of the charging ports in Canton. AmpUp runs 2 stations in Canton. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Canton Ridge 1?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 178 of those stations are in Connecticut, 10% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 26, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 8, 2026.

Frequently asked questions

How many chargers does Canton Ridge 1 have?

Canton Ridge 1 has 6 charging ports: 6 Level 2.

Does Canton Ridge 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does Canton Ridge 1 have?

Canton Ridge 1 has J1772 connectors.

Is charging at Canton Ridge 1 free?

Pricing as reported to the DOE registry: $0.40 per kWh.

Is Canton Ridge 1 open to the public?

Yes. Canton Ridge 1 is listed with public access, and its status is available.

Where is Canton Ridge 1?

Canton Ridge 1 is at 3 Cherry Brook Rd, Canton, CT 06019. Its coordinates are 41.84000, -72.93000.

More EV charging around Canton

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 319327, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Canton Ridge 1, Canton, CT (AFDC station 319327)”, https://chargecensus.com/stations/connecticut/canton-ridge-1-319327 (data as of October 12, 2026).