Hyatt Regency Long Beach
AvailableEV charging station in Long Beach, California, not on a charging network — 1 Level 2. US DOE AFDC station 7172.
At a glance
Hyatt Regency Long Beach is a public EV charging station at 200 S Pine Ave in Long Beach, California, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 4, 2012.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 7172 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Hotel |
| Open date | May 4, 2012 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 200 S Pine Ave
- City
- Long Beach
- State
- California
- ZIP
- 90802
- Coordinates
- 33.76370, -118.19200
Within ~15 km
Nearby charging
- Artesia Apartments70 ports
Loop · Available
- Harmony Gates59 ports
Loop · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- LADWP - Haynes Power Plant31 ports
Non-networked · Available
- SWTCH Energy Inc.30 ports
SWTCH · Available
What kind of charging does Hyatt Regency Long Beach offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 73% below the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a hotel location.
How does Hyatt Regency Long Beach compare with other stations in Long Beach?
Long Beach has 229 charging stations in the DOE registry with 679 ports, the 14th-most of 812 cities and towns in California. Hyatt Regency Long Beach accounts for under 1% of the charging ports in Long Beach. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Hyatt Regency Long Beach?
Hyatt Regency Long Beach is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 4, 2012, one of 93 stations in California with a 2012 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Hyatt Regency Long Beach have?
Hyatt Regency Long Beach has 1 charging port: 1 Level 2.
Does Hyatt Regency Long Beach have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Hyatt Regency Long Beach have?
Hyatt Regency Long Beach has J1772 connectors.
Is charging at Hyatt Regency Long Beach free?
Pricing as reported to the DOE registry: Free.
Is Hyatt Regency Long Beach open to the public?
Yes. Hyatt Regency Long Beach is listed with public access, and its status is available.
Where is Hyatt Regency Long Beach?
Hyatt Regency Long Beach is at 200 S Pine Ave, Long Beach, CA 90802. Its coordinates are 33.76370, -118.19200.
More EV charging around Long Beach
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 7172, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hyatt Regency Long Beach, Long Beach, CA (AFDC station 7172)”, https://chargecensus.com/stations/california/hyatt-regency-long-beach-7172 (data as of October 12, 2026).