Harmony Gates
AvailableEV charging station in West Hollywood, California on the Loop network — 59 Level 2. US DOE AFDC station 463176.
At a glance
Harmony Gates is a public EV charging station at 5220 Harmony Ave in West Hollywood, California, on the Loop network. It has 59 charging ports (59 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 12, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 463176 |
| Network | Loop |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Feb 12, 2026 |
| Last updated at source | Jul 15, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $1 activation fee; $0.45 per kWh
Location
- Address
- 5220 Harmony Ave
- City
- West Hollywood
- State
- California
- ZIP
- 91601
- Coordinates
- 33.85204, -118.28893
Within ~15 km
Nearby charging
- Artesia Apartments70 ports
Loop · Available
- LA County DHS MLK Lot A70 ports
PowerFlex · Available
- Westin Los Angeles Airport50 ports
Autel · Available
bp pulse · Available
- Airport Center40 ports
AmpUp · Available
Tesla Destination · Available
What kind of charging does Harmony Gates offer?
Of its 59 ports, 59 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 15.7 times the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$1 activation fee; $0.45 per kWh”. The site is listed as a other location.
How does Harmony Gates compare with other stations in West Hollywood?
West Hollywood has 85 charging stations in the DOE registry with 321 ports. Harmony Gates accounts for 18% of the charging ports in West Hollywood. Loop runs 5 stations in West Hollywood. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Harmony Gates?
Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 591 of those stations are in California, 3% of the state's 21,814. By port count this is the 9th-biggest Loop station in the country.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 12, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Jul 15, 2026.
Frequently asked questions
How many chargers does Harmony Gates have?
Harmony Gates has 59 charging ports: 59 Level 2.
Does Harmony Gates have DC fast charging?
No. The registry lists no DC fast ports here; its 59 ports are all Level 2.
What connectors does Harmony Gates have?
Harmony Gates has J1772 connectors.
Is charging at Harmony Gates free?
Pricing as reported to the DOE registry: $1 activation fee; $0.45 per kWh.
Is Harmony Gates open to the public?
Yes. Harmony Gates is listed with public access, and its status is available.
Where is Harmony Gates?
Harmony Gates is at 5220 Harmony Ave, West Hollywood, CA 91601. Its coordinates are 33.85204, -118.28893.
More EV charging around West Hollywood
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 463176, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Harmony Gates, West Hollywood, CA (AFDC station 463176)”, https://chargecensus.com/stations/california/harmony-gates-463176 (data as of October 12, 2026).