LADWP - Haynes Power Plant
AvailableEV charging station in Long Beach, California, not on a charging network — 31 Level 2. US DOE AFDC station 1531.
At a glance
LADWP - Haynes Power Plant is a private EV charging station at 6801 E 2nd St in Long Beach, California, not attached to a charging network. It has 31 charging ports (31 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 1, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 1531 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Utility |
| Open date | May 1, 2018 |
| Last updated at source | Aug 7, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 6801 E 2nd St
- City
- Long Beach
- State
- California
- ZIP
- 90803
- Coordinates
- 33.75980, -118.09667
Within ~15 km
Nearby charging
- Artesia Apartments70 ports
Loop · Available
Noodoe · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- SWTCH Energy Inc.30 ports
SWTCH · Available
Tesla Supercharger · Available
What kind of charging does LADWP - Haynes Power Plant offer?
Of its 31 ports, 31 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 8.3 times the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location. It is flagged as workplace charging.
How does LADWP - Haynes Power Plant compare with other stations in Long Beach?
Long Beach has 229 charging stations in the DOE registry with 679 ports, the 14th-most of 812 cities and towns in California. LADWP - Haynes Power Plant accounts for 5% of the charging ports in Long Beach. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates LADWP - Haynes Power Plant?
LADWP - Haynes Power Plant is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on May 1, 2018, one of 330 stations in California with a 2018 open date. The station's record was last updated at the source on Aug 7, 2026.
Frequently asked questions
How many chargers does LADWP - Haynes Power Plant have?
LADWP - Haynes Power Plant has 31 charging ports: 31 Level 2.
Does LADWP - Haynes Power Plant have DC fast charging?
No. The registry lists no DC fast ports here; its 31 ports are all Level 2.
What connectors does LADWP - Haynes Power Plant have?
LADWP - Haynes Power Plant has J1772 connectors.
Is LADWP - Haynes Power Plant open to the public?
No. LADWP - Haynes Power Plant is listed with private access.
Where is LADWP - Haynes Power Plant?
LADWP - Haynes Power Plant is at 6801 E 2nd St, Long Beach, CA 90803. Its coordinates are 33.75980, -118.09667.
More EV charging around Long Beach
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 1531, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “LADWP - Haynes Power Plant, Long Beach, CA (AFDC station 1531)”, https://chargecensus.com/stations/california/ladwp-haynes-power-plant-1531 (data as of October 12, 2026).