Grant Summit Cabins
AvailableEV charging station in Bryant, Alabama on the Rivian Waypoints network — 2 Level 2. US DOE AFDC station 391202.
At a glance
Grant Summit Cabins is a public EV charging station at 395 County Road 159 in Bryant, Alabama, on the Rivian Waypoints network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 16, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 391202 |
| Network | Rivian Waypoints |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Nov 16, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 395 County Road 159
- City
- Bryant
- State
- Alabama
- ZIP
- 35958
- Coordinates
- 34.98177, -85.61728
Within ~15 km
Nearby charging
- Google14 ports
ChargePoint · Available
- Kimball, TN - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Cloudland Canyon State Park6 ports
Rivian Waypoints · Available
ChargePoint · Available
- Georgia Power Trenton Dc11 ports
ChargePoint · Available
- Georgia Power Trenton Dc21 ports
ChargePoint · Available
What kind of charging does Grant Summit Cabins offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 39% below the Alabama average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does Grant Summit Cabins compare with other stations in Bryant?
Bryant has 1 charging station in the DOE registry with 2 ports. It is the only Rivian Waypoints station in Bryant. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.
Who operates Grant Summit Cabins?
Rivian Waypoints operates 207 stations in the registry across 28 states, with 540 Level 2 ports in total. 1 of those stations are in Alabama, under 1% of the state's 693.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 16, 2022, one of 88 stations in Alabama with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Grant Summit Cabins have?
Grant Summit Cabins has 2 charging ports: 2 Level 2.
Does Grant Summit Cabins have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Grant Summit Cabins have?
Grant Summit Cabins has J1772 connectors.
Is Grant Summit Cabins open to the public?
Yes. Grant Summit Cabins is listed with public access, and its status is available.
Where is Grant Summit Cabins?
Grant Summit Cabins is at 395 County Road 159, Bryant, AL 35958. Its coordinates are 34.98177, -85.61728.
More EV charging around Bryant
Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 391202, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Grant Summit Cabins, Bryant, AL (AFDC station 391202)”, https://chargecensus.com/stations/alabama/grant-summit-cabins-391202 (data as of October 12, 2026).