ChargeCensus

Google

Available

EV charging station in Bridgeport, Alabama on the ChargePoint network — 14 Level 2. US DOE AFDC station 373826.

At a glance

Google is a private EV charging station at 141-61 Co Rd 459 in Bridgeport, Alabama, on the ChargePoint network. It has 14 charging ports (14 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 31, 2021.

Total ports
14
DC fast
0
Level 2
14
Access
Private
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 5 nearby

Station record

DOE registry record

FieldValue
AFDC station ID373826
NetworkChargePoint
StatusAvailable (E)
AccessPrivate
FacilityOffice building
Open dateMar 31, 2021
Last updated at sourceFeb 27, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
141-61 Co Rd 459
City
Bridgeport
State
Alabama
ZIP
35740
Coordinates
34.91309, -85.74862

Within ~15 km

Nearby charging

What kind of charging does Google offer?

Of its 14 ports, 14 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 4.3 times the Alabama average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a office building location. It is flagged as workplace charging.

How does Google compare with other stations in Bridgeport?

Bridgeport has 1 charging station in the DOE registry with 14 ports. It is the only ChargePoint station in Bridgeport. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.

Who operates Google?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 310 of those stations are in Alabama, 45% of the state's 693.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Mar 31, 2021, one of 44 stations in Alabama with a 2021 open date. The station's record was last updated at the source on Feb 27, 2026.

Frequently asked questions

How many chargers does Google have?

Google has 14 charging ports: 14 Level 2.

Does Google have DC fast charging?

No. The registry lists no DC fast ports here; its 14 ports are all Level 2.

What connectors does Google have?

Google has J1772 connectors.

Is Google open to the public?

No. Google is listed with private access.

Where is Google?

Google is at 141-61 Co Rd 459, Bridgeport, AL 35740. Its coordinates are 34.91309, -85.74862.

More EV charging around Bridgeport

Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 373826, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Google, Bridgeport, AL (AFDC station 373826)”, https://chargecensus.com/stations/alabama/google-373826 (data as of October 12, 2026).