ChargeCensus

Redstone

Available

EV charging station in Huntsville, Alabama, not on a charging network — 34 Level 2. US DOE AFDC station 445482.

At a glance

Redstone is a private EV charging station at 226 Arsenal Dr in Huntsville, Alabama, not attached to a charging network. It has 34 charging ports (34 Level 2) with NEMA 14-50 connectors. The US DOE registry lists it as available, open since Aug 5, 2025.

Total ports
34
DC fast
0
Level 2
34
Access
Private
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID445482
NetworkNon-networked
StatusAvailable (E)
AccessPrivate
FacilityFederal government
Open dateAug 5, 2025
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • NEMA 14-50 — 240V outlet (RV-style plug).

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
226 Arsenal Dr
State
Alabama
ZIP
35808
Coordinates
34.68739, -86.67883

Within ~15 km

Nearby charging

What kind of charging does Redstone offer?

Of its 34 ports, 34 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 10.4 times the Alabama average of 3.3 ports per station. The registry lists one connector type: NEMA 14-50, 240V outlet (RV-style plug). The site is listed as a federal government location. It is flagged as workplace charging.

How does Redstone compare with other stations in Huntsville?

Huntsville has 59 charging stations in the DOE registry with 225 ports, the 2nd-most of 119 cities and towns in Alabama. Redstone accounts for 15% of the charging ports in Huntsville. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. By port count, Redstone is the 2nd-biggest station in Alabama.

Who operates Redstone?

Redstone is listed as non-networked: its chargers are not run through a charging-network account. Alabama has 126 non-networked stations, 18% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Aug 5, 2025, one of 112 stations in Alabama with a 2025 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Redstone have?

Redstone has 34 charging ports: 34 Level 2.

Does Redstone have DC fast charging?

No. The registry lists no DC fast ports here; its 34 ports are all Level 2.

What connectors does Redstone have?

Redstone has NEMA 14-50 connectors.

Is Redstone open to the public?

No. Redstone is listed with private access.

Where is Redstone?

Redstone is at 226 Arsenal Dr, Huntsville, AL 35808. Its coordinates are 34.68739, -86.67883.

More EV charging around Huntsville

Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 445482, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Redstone, Huntsville, AL (AFDC station 445482)”, https://chargecensus.com/stations/alabama/redstone-445482 (data as of October 12, 2026).