Woodland Pond Lot 1
AvailableEV charging station in New Palz, New York on the ViaLynk network — 4 Level 2. US DOE AFDC station 324896.
At a glance
Woodland Pond Lot 1 is a public EV charging station at 100 Woodland Pond Circle in New Palz, New York, on the ViaLynk network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 14, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 324896 |
| Network | ViaLynk |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 14, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 Woodland Pond Circle
- City
- New Palz
- State
- New York
- ZIP
- 12561
- Coordinates
- 41.75786, -74.06221
Within ~15 km
Nearby charging
- Zero Place24 ports
AmpUp · Available
- SUNY Ulster - Hasbrouck Hall18 ports
ViaLynk · Available
- ShopRite Plaza12 ports
ViaLynk · Available
- Mohonk Preserve10 ports
AmpUp · Available
AmpUp · Available
- Healey Ford - Poughkeepsie8 ports
ChargeSmart EV · Available
What kind of charging does Woodland Pond Lot 1 offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is roughly in line with the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Woodland Pond Lot 1 compare with other stations in New Palz?
New Palz has 1 charging station in the DOE registry with 4 ports. It is the only ViaLynk station in New Palz. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Woodland Pond Lot 1?
ViaLynk operates 1,012 stations in the registry across 35 states, with 616 DC fast and 4,903 Level 2 ports in total. 730 of those stations are in New York, 12% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 14, 2023, one of 822 stations in New York with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Woodland Pond Lot 1 have?
Woodland Pond Lot 1 has 4 charging ports: 4 Level 2.
Does Woodland Pond Lot 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Woodland Pond Lot 1 have?
Woodland Pond Lot 1 has J1772 connectors.
Is Woodland Pond Lot 1 open to the public?
Yes. Woodland Pond Lot 1 is listed with public access, and its status is available.
Where is Woodland Pond Lot 1?
Woodland Pond Lot 1 is at 100 Woodland Pond Circle, New Palz, NY 12561. Its coordinates are 41.75786, -74.06221.
More EV charging around New Palz
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 324896, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Woodland Pond Lot 1, New Palz, NY (AFDC station 324896)”, https://chargecensus.com/stations/new-york/woodland-pond-lot-1-324896 (data as of October 12, 2026).