Wheatland-Chili Elementry1
AvailableEV charging station in Scottsville, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 187784.
At a glance
Wheatland-Chili Elementry1 is a public EV charging station at 13 Beckwith Ave in Scottsville, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 20, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 187784 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 20, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 13 Beckwith Ave
- City
- Scottsville
- State
- New York
- ZIP
- 14546
- Coordinates
- 43.02592, -77.74823
Within ~15 km
Nearby charging
ChargeSmart EV · Available
- 345 Spencerport14 ports
Red E · Available
- Wedgewood West Apartments14 ports
ViaLynk · Available
- Bob Johnson Ford Avon12 ports
ChargeSmart EV · Available
Tesla Destination · Available
- Erie Station Village - North10 ports
ChargeSmart EV · Available
What kind of charging does Wheatland-Chili Elementry1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Wheatland-Chili Elementry1 compare with other stations in Scottsville?
Scottsville has 8 charging stations in the DOE registry with 36 ports. Wheatland-Chili Elementry1 accounts for 6% of the charging ports in Scottsville. ChargePoint runs 4 stations in Scottsville. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Wheatland-Chili Elementry1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 20, 2021, one of 766 stations in New York with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Wheatland-Chili Elementry1 have?
Wheatland-Chili Elementry1 has 2 charging ports: 2 Level 2.
Does Wheatland-Chili Elementry1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Wheatland-Chili Elementry1 have?
Wheatland-Chili Elementry1 has J1772 connectors.
Is Wheatland-Chili Elementry1 open to the public?
Yes. Wheatland-Chili Elementry1 is listed with public access, and its status is available.
Where is Wheatland-Chili Elementry1?
Wheatland-Chili Elementry1 is at 13 Beckwith Ave, Scottsville, NY 14546. Its coordinates are 43.02592, -77.74823.
More EV charging around Scottsville
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 187784, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Wheatland-Chili Elementry1, Scottsville, NY (AFDC station 187784)”, https://chargecensus.com/stations/new-york/wheatland-chili-elementry1-187784 (data as of October 12, 2026).