ChargeCensus

Waterclub2582 Garage 2 Charge

Available

EV charging station in Poughkeepsie, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 162288.

At a glance

Waterclub2582 Garage 2 Charge is a public EV charging station at 36 Pine Street in Poughkeepsie, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID162288
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 12, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
36 Pine Street
ZIP
12601
Coordinates
41.69885, -73.93751

Within ~15 km

Nearby charging

What kind of charging does Waterclub2582 Garage 2 Charge offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Waterclub2582 Garage 2 Charge compare with other stations in Poughkeepsie?

Poughkeepsie has 41 charging stations in the DOE registry with 153 ports, the 19th-most of 757 cities and towns in New York. Waterclub2582 Garage 2 Charge accounts for 1% of the charging ports in Poughkeepsie. ChargePoint runs 20 stations in Poughkeepsie. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Waterclub2582 Garage 2 Charge?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 400 stations in New York with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Waterclub2582 Garage 2 Charge have?

Waterclub2582 Garage 2 Charge has 2 charging ports: 2 Level 2.

Does Waterclub2582 Garage 2 Charge have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Waterclub2582 Garage 2 Charge have?

Waterclub2582 Garage 2 Charge has J1772 connectors.

Is Waterclub2582 Garage 2 Charge open to the public?

Yes. Waterclub2582 Garage 2 Charge is listed with public access, and its status is available.

Where is Waterclub2582 Garage 2 Charge?

Waterclub2582 Garage 2 Charge is at 36 Pine Street, Poughkeepsie, NY 12601. Its coordinates are 41.69885, -73.93751.

More EV charging around Poughkeepsie

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 162288, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Waterclub2582 Garage 2 Charge, Poughkeepsie, NY (AFDC station 162288)”, https://chargecensus.com/stations/new-york/waterclub2582-garage-2-charge-162288 (data as of October 12, 2026).