ChargeCensus

Vassar College Station 2

Available

EV charging station in Arlington, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 352057.

At a glance

Vassar College Station 2 is a public EV charging station at 165 College Avenue in Arlington, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 3, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID352057
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 3, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
165 College Avenue
City
Arlington
ZIP
12603
Coordinates
41.69039, -73.90138

Within ~15 km

Nearby charging

What kind of charging does Vassar College Station 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Vassar College Station 2 compare with other stations in Arlington?

Arlington has 7 charging stations in the DOE registry with 15 ports. Vassar College Station 2 accounts for 13% of the charging ports in Arlington. ChargePoint runs 6 stations in Arlington. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Vassar College Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 3, 2024, one of 927 stations in New York with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Vassar College Station 2 have?

Vassar College Station 2 has 2 charging ports: 2 Level 2.

Does Vassar College Station 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Vassar College Station 2 have?

Vassar College Station 2 has J1772 connectors.

Is Vassar College Station 2 open to the public?

Yes. Vassar College Station 2 is listed with public access, and its status is available.

Where is Vassar College Station 2?

Vassar College Station 2 is at 165 College Avenue, Arlington, NY 12603. Its coordinates are 41.69039, -73.90138.

More EV charging around Arlington

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 352057, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Vassar College Station 2, Arlington, NY (AFDC station 352057)”, https://chargecensus.com/stations/new-york/vassar-college-station-2-352057 (data as of October 12, 2026).