Vassar College South Lot 1
AvailableEV charging station in Arlington, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 155289.
At a glance
Vassar College South Lot 1 is a public EV charging station at 112130 Raymond Ave in Arlington, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 10, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 155289 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 10, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 112130 Raymond Ave
- City
- Arlington
- State
- New York
- ZIP
- 12603
- Coordinates
- 41.68184, -73.89467
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- ShopRite Plaza12 ports
ViaLynk · Available
- Tennis Courts10 ports
ViaLynk · Available
- Popula Boulevard10 ports
ViaLynk · Available
- Surrey Lane10 ports
ViaLynk · Available
- Sherwood Forest10 ports
ViaLynk · Available
What kind of charging does Vassar College South Lot 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Vassar College South Lot 1 compare with other stations in Arlington?
Arlington has 7 charging stations in the DOE registry with 15 ports. Vassar College South Lot 1 accounts for 13% of the charging ports in Arlington. ChargePoint runs 6 stations in Arlington. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Vassar College South Lot 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 10, 2020, one of 400 stations in New York with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Vassar College South Lot 1 have?
Vassar College South Lot 1 has 2 charging ports: 2 Level 2.
Does Vassar College South Lot 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Vassar College South Lot 1 have?
Vassar College South Lot 1 has J1772 connectors.
Is Vassar College South Lot 1 open to the public?
Yes. Vassar College South Lot 1 is listed with public access, and its status is available.
Where is Vassar College South Lot 1?
Vassar College South Lot 1 is at 112130 Raymond Ave, Arlington, NY 12603. Its coordinates are 41.68184, -73.89467.
More EV charging around Arlington
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 155289, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Vassar College South Lot 1, Arlington, NY (AFDC station 155289)”, https://chargecensus.com/stations/new-york/vassar-college-south-lot-1-155289 (data as of October 12, 2026).