Town of Westport
AvailableEV charging station in Westport, New York on the ViaLynk network — 2 DC fast. US DOE AFDC station 334460.
At a glance
Town of Westport is a public EV charging station at 34 State Rt. 9N in Westport, New York, on the ViaLynk network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 2, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 334460 |
| Network | ViaLynk |
| Status | Available (E) |
| Access | Public |
| Open date | May 2, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 34 State Rt. 9N
- City
- Westport
- State
- New York
- ZIP
- 12993
- Coordinates
- 44.18188, -73.43256
Within ~15 km
Nearby charging
- EVolve NY Lewis4 ports
Electrify America · Available
- Town Of Moriah Moriahev22 ports
ChargePoint · Available
Non-networked · Available
- Town of Westport2 ports
EV Connect · Available
- Furnace Point Fpev32 ports
ChargePoint · Available
- Town Of Moriah Moriahev12 ports
ChargePoint · Available
What kind of charging does Town of Westport offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about half of the New York average of 4 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Town of Westport compare with other stations in Westport?
Westport has 4 charging stations in the DOE registry with 8 ports. Town of Westport accounts for 25% of the charging ports in Westport. It is the only ViaLynk station in Westport. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Town of Westport?
ViaLynk operates 1,012 stations in the registry across 35 states, with 616 DC fast and 4,903 Level 2 ports in total. 730 of those stations are in New York, 12% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 2, 2024, one of 927 stations in New York with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Town of Westport have?
Town of Westport has 2 charging ports: 2 DC fast.
Does Town of Westport have DC fast charging?
Yes. The registry lists 2 DC fast ports at Town of Westport, with CCS connectors.
What connectors does Town of Westport have?
Town of Westport has CCS connectors.
Is Town of Westport open to the public?
Yes. Town of Westport is listed with public access, and its status is available.
Where is Town of Westport?
Town of Westport is at 34 State Rt. 9N, Westport, NY 12993. Its coordinates are 44.18188, -73.43256.
More EV charging around Westport
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 334460, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Town of Westport, Westport, NY (AFDC station 334460)”, https://chargecensus.com/stations/new-york/town-of-westport-334460 (data as of October 12, 2026).