Stillwater Town Hall
AvailableEV charging station in Stillwater, New York on the ViaLynk network — 2 Level 2. US DOE AFDC station 324861.
At a glance
Stillwater Town Hall is a public EV charging station at 881 Hudson Ave in Stillwater, New York, on the ViaLynk network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 16, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 324861 |
| Network | ViaLynk |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 16, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 881 Hudson Ave
- City
- Stillwater
- State
- New York
- ZIP
- 12170
- Coordinates
- 42.94254, -73.64861
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Chargesmart Decommissioned Sites14 ports
Non-networked · Available
- 182 Excelsior Ave12 ports
Quickcharge · Available
- Clifton Park Center10 ports
Quickcharge · Available
Quickcharge · Available
- Residence 158 ports
Quickcharge · Available
What kind of charging does Stillwater Town Hall offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Stillwater Town Hall compare with other stations in Stillwater?
Stillwater has 1 charging station in the DOE registry with 2 ports. It is the only ViaLynk station in Stillwater. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Stillwater Town Hall?
ViaLynk operates 1,012 stations in the registry across 35 states, with 616 DC fast and 4,903 Level 2 ports in total. 730 of those stations are in New York, 12% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 16, 2023, one of 822 stations in New York with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Stillwater Town Hall have?
Stillwater Town Hall has 2 charging ports: 2 Level 2.
Does Stillwater Town Hall have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Stillwater Town Hall have?
Stillwater Town Hall has J1772 connectors.
Is Stillwater Town Hall open to the public?
Yes. Stillwater Town Hall is listed with public access, and its status is available.
Where is Stillwater Town Hall?
Stillwater Town Hall is at 881 Hudson Ave, Stillwater, NY 12170. Its coordinates are 42.94254, -73.64861.
More EV charging around Stillwater
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 324861, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stillwater Town Hall, Stillwater, NY (AFDC station 324861)”, https://chargecensus.com/stations/new-york/stillwater-town-hall-324861 (data as of October 12, 2026).