Rivertrail Rivertrail Ev1
AvailableEV charging station in Saranac Lake, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 356144.
At a glance
Rivertrail Rivertrail Ev1 is a public EV charging station at 79 Woodruff Street in Saranac Lake, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 21, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 356144 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 21, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 79 Woodruff Street
- City
- Saranac Lake
- State
- New York
- ZIP
- 12983
- Coordinates
- 44.32950, -74.12946
Within ~15 km
Nearby charging
- Main Parking Lot12 ports
EV Connect · Available
- Cambria Hotel Lake Placid8 ports
Amped Up · Available
- Aldi TUL 46 Saranac Lake8 ports
Red E · Available
ChargeSmart EV · Available
Tesla Supercharger · Available
- Upstate Auto8 ports
ViaLynk · Available
What kind of charging does Rivertrail Rivertrail Ev1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Rivertrail Rivertrail Ev1 compare with other stations in Saranac Lake?
Saranac Lake has 15 charging stations in the DOE registry with 52 ports. Rivertrail Rivertrail Ev1 accounts for 4% of the charging ports in Saranac Lake. ChargePoint runs 7 stations in Saranac Lake. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Rivertrail Rivertrail Ev1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 21, 2024, one of 927 stations in New York with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Rivertrail Rivertrail Ev1 have?
Rivertrail Rivertrail Ev1 has 2 charging ports: 2 Level 2.
Does Rivertrail Rivertrail Ev1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Rivertrail Rivertrail Ev1 have?
Rivertrail Rivertrail Ev1 has J1772 connectors.
Is Rivertrail Rivertrail Ev1 open to the public?
Yes. Rivertrail Rivertrail Ev1 is listed with public access, and its status is available.
Where is Rivertrail Rivertrail Ev1?
Rivertrail Rivertrail Ev1 is at 79 Woodruff Street, Saranac Lake, NY 12983. Its coordinates are 44.32950, -74.12946.
More EV charging around Saranac Lake
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 356144, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Rivertrail Rivertrail Ev1, Saranac Lake, NY (AFDC station 356144)”, https://chargecensus.com/stations/new-york/rivertrail-rivertrail-ev1-356144 (data as of October 12, 2026).