ChargeCensus

National Grid Tops Watertown

Available

EV charging station in Watertown, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 162231.

At a glance

National Grid Tops Watertown is a public EV charging station at 22050 US-11 in Watertown, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID162231
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 12, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
22050 US-11
ZIP
13601
Coordinates
43.99481, -75.90173

Within ~15 km

Nearby charging

What kind of charging does National Grid Tops Watertown offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does National Grid Tops Watertown compare with other stations in Watertown?

Watertown has 20 charging stations in the DOE registry with 82 ports. National Grid Tops Watertown accounts for 2% of the charging ports in Watertown. ChargePoint runs 6 stations in Watertown. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates National Grid Tops Watertown?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 400 stations in New York with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does National Grid Tops Watertown have?

National Grid Tops Watertown has 2 charging ports: 2 Level 2.

Does National Grid Tops Watertown have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does National Grid Tops Watertown have?

National Grid Tops Watertown has J1772 connectors.

Is National Grid Tops Watertown open to the public?

Yes. National Grid Tops Watertown is listed with public access, and its status is available.

Where is National Grid Tops Watertown?

National Grid Tops Watertown is at 22050 US-11, Watertown, NY 13601. Its coordinates are 43.99481, -75.90173.

More EV charging around Watertown

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 162231, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “National Grid Tops Watertown, Watertown, NY (AFDC station 162231)”, https://chargecensus.com/stations/new-york/national-grid-tops-watertown-162231 (data as of October 12, 2026).