Milton Ny Ccenter4
AvailableEV charging station in Ballston Spa, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 258941.
At a glance
Milton Ny Ccenter4 is a public EV charging station at 310 Northline Rd in Ballston Spa, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 11, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 258941 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 11, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 310 Northline Rd
- City
- Ballston Spa
- State
- New York
- ZIP
- 12020
- Coordinates
- 43.02493, -73.85116
Within ~15 km
Nearby charging
- Van Patten Golf Club50 ports
ViaLynk · Available
- 182 Excelsior Ave12 ports
Quickcharge · Available
- Enclave 5010 ports
ViaLynk · Available
- Bayberry8 ports
ChargeSmart EV · Available
- Fairfield Inn & Suites Malta8 ports
Quickcharge · Available
- 2452 Route 9 Malta8 ports
ViaLynk · Available
What kind of charging does Milton Ny Ccenter4 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Milton Ny Ccenter4 compare with other stations in Ballston Spa?
Ballston Spa has 38 charging stations in the DOE registry with 105 ports, the 22nd-most of 757 cities and towns in New York. Milton Ny Ccenter4 accounts for 2% of the charging ports in Ballston Spa. ChargePoint runs 25 stations in Ballston Spa. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Milton Ny Ccenter4?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 11, 2023, one of 822 stations in New York with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Milton Ny Ccenter4 have?
Milton Ny Ccenter4 has 2 charging ports: 2 Level 2.
Does Milton Ny Ccenter4 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Milton Ny Ccenter4 have?
Milton Ny Ccenter4 has J1772 connectors.
Is Milton Ny Ccenter4 open to the public?
Yes. Milton Ny Ccenter4 is listed with public access, and its status is available.
Where is Milton Ny Ccenter4?
Milton Ny Ccenter4 is at 310 Northline Rd, Ballston Spa, NY 12020. Its coordinates are 43.02493, -73.85116.
More EV charging around Ballston Spa
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 258941, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Milton Ny Ccenter4, Ballston Spa, NY (AFDC station 258941)”, https://chargecensus.com/stations/new-york/milton-ny-ccenter4-258941 (data as of October 12, 2026).