Main Lot Snc 2
AvailableEV charging station in Sterling, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 396101.
At a glance
Main Lot Snc 2 is a public EV charging station at 15730 Jensvold Rd in Sterling, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 22, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 396101 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 22, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 15730 Jensvold Rd
- City
- Sterling
- State
- New York
- ZIP
- 13156
- Coordinates
- 43.37871, -76.65726
Within ~15 km
Nearby charging
- Breitbeck Park4 ports
ViaLynk · Available
- Best Western Oswego4 ports
ViaLynk · Available
AmpUp · Available
- Shineman South Lee Hall 62 ports
ChargePoint · Available
- Shineman South Lee Hall 32 ports
ChargePoint · Available
- Shineman South Lee Hall 72 ports
ChargePoint · Available
What kind of charging does Main Lot Snc 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Main Lot Snc 2 compare with other stations in Sterling?
Sterling has 2 charging stations in the DOE registry with 4 ports. Main Lot Snc 2 accounts for 50% of the charging ports in Sterling. ChargePoint runs 2 stations in Sterling. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Main Lot Snc 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 22, 2025, one of 934 stations in New York with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Main Lot Snc 2 have?
Main Lot Snc 2 has 2 charging ports: 2 Level 2.
Does Main Lot Snc 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Main Lot Snc 2 have?
Main Lot Snc 2 has J1772 connectors.
Is Main Lot Snc 2 open to the public?
Yes. Main Lot Snc 2 is listed with public access, and its status is available.
Where is Main Lot Snc 2?
Main Lot Snc 2 is at 15730 Jensvold Rd, Sterling, NY 13156. Its coordinates are 43.37871, -76.65726.
More EV charging around Sterling
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 396101, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Main Lot Snc 2, Sterling, NY (AFDC station 396101)”, https://chargecensus.com/stations/new-york/main-lot-snc-2-396101 (data as of October 12, 2026).