Hydepark Hyde Pk Town Ha
AvailableEV charging station in Hyde Park, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 164503.
At a glance
Hydepark Hyde Pk Town Ha is a public EV charging station at 4383 U.S. 9 in Hyde Park, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 24, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 164503 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 24, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4383 U.S. 9
- City
- Hyde Park
- State
- New York
- ZIP
- 12538
- Coordinates
- 41.79084, -73.93644
Within ~15 km
Nearby charging
- Zero Place24 ports
AmpUp · Available
Tesla Supercharger · Available
- ShopRite Plaza12 ports
ViaLynk · Available
- Ulster County Probation12 ports
ViaLynk · Available
- Joy's Lane12 ports
ViaLynk · Available
- Poughkeepsie - Town Hall10 ports
FLO · Available
What kind of charging does Hydepark Hyde Pk Town Ha offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Hydepark Hyde Pk Town Ha compare with other stations in Hyde Park?
Hyde Park has 3 charging stations in the DOE registry with 8 ports. Hydepark Hyde Pk Town Ha accounts for 25% of the charging ports in Hyde Park. ChargePoint runs 2 stations in Hyde Park. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Hydepark Hyde Pk Town Ha?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 24, 2020, one of 400 stations in New York with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Hydepark Hyde Pk Town Ha have?
Hydepark Hyde Pk Town Ha has 2 charging ports: 2 Level 2.
Does Hydepark Hyde Pk Town Ha have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Hydepark Hyde Pk Town Ha have?
Hydepark Hyde Pk Town Ha has J1772 connectors.
Is Hydepark Hyde Pk Town Ha open to the public?
Yes. Hydepark Hyde Pk Town Ha is listed with public access, and its status is available.
Where is Hydepark Hyde Pk Town Ha?
Hydepark Hyde Pk Town Ha is at 4383 U.S. 9, Hyde Park, NY 12538. Its coordinates are 41.79084, -73.93644.
More EV charging around Hyde Park
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 164503, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hydepark Hyde Pk Town Ha, Hyde Park, NY (AFDC station 164503)”, https://chargecensus.com/stations/new-york/hydepark-hyde-pk-town-ha-164503 (data as of October 12, 2026).