Hudson Preserve Bldg 19 #13
AvailableEV charging station in Watervliet, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 143251.
At a glance
Hudson Preserve Bldg 19 #13 is a public EV charging station at 1601 Beryl Way in Watervliet, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 15, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 143251 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 15, 2019 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1601 Beryl Way
- City
- Watervliet
- State
- New York
- ZIP
- 12189
- Coordinates
- 42.73286, -73.72669
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- MVP Arena Parking Garage22 ports
EV Connect · Available
- Crossgates Mall20 ports
ViaLynk · Available
- 20 Forbes Ave20 ports
Quickcharge · Available
Tesla Supercharger · Available
- Redburn 21 Erie Assoc20 ports
Quickcharge · Available
What kind of charging does Hudson Preserve Bldg 19 #13 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Hudson Preserve Bldg 19 #13 compare with other stations in Watervliet?
Watervliet has 30 charging stations in the DOE registry with 78 ports. Hudson Preserve Bldg 19 #13 accounts for 3% of the charging ports in Watervliet. ChargePoint runs 24 stations in Watervliet. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Hudson Preserve Bldg 19 #13?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2019, one of 256 stations in New York with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Hudson Preserve Bldg 19 #13 have?
Hudson Preserve Bldg 19 #13 has 2 charging ports: 2 Level 2.
Does Hudson Preserve Bldg 19 #13 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Hudson Preserve Bldg 19 #13 have?
Hudson Preserve Bldg 19 #13 has J1772 connectors.
Is Hudson Preserve Bldg 19 #13 open to the public?
Yes. Hudson Preserve Bldg 19 #13 is listed with public access, and its status is available.
Where is Hudson Preserve Bldg 19 #13?
Hudson Preserve Bldg 19 #13 is at 1601 Beryl Way, Watervliet, NY 12189. Its coordinates are 42.73286, -73.72669.
More EV charging around Watervliet
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 143251, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hudson Preserve Bldg 19 #13, Watervliet, NY (AFDC station 143251)”, https://chargecensus.com/stations/new-york/hudson-preserve-bldg-19-13-143251 (data as of October 12, 2026).