ChargeCensus

Greymoor Way - Building 14

Available

EV charging station in Baldwinsville, New York on the ViaLynk network — 2 Level 2. US DOE AFDC station 223129.

At a glance

Greymoor Way - Building 14 is a public EV charging station at 2608 Pipers Ct in Baldwinsville, New York, on the ViaLynk network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 28, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID223129
NetworkViaLynk
StatusAvailable (E)
AccessPublic
Open dateOct 28, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ViaLynk

Operates 1,012 stations in the DOE registry — view the full network →

Location

Address
2608 Pipers Ct
ZIP
13027
Coordinates
43.18098, -76.30008

Within ~15 km

Nearby charging

What kind of charging does Greymoor Way - Building 14 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Greymoor Way - Building 14 compare with other stations in Baldwinsville?

Baldwinsville has 31 charging stations in the DOE registry with 144 ports. Greymoor Way - Building 14 accounts for 1% of the charging ports in Baldwinsville. ViaLynk runs 21 stations in Baldwinsville. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Greymoor Way - Building 14?

ViaLynk operates 1,012 stations in the registry across 35 states, with 616 DC fast and 4,903 Level 2 ports in total. 730 of those stations are in New York, 12% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 28, 2021, one of 766 stations in New York with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Greymoor Way - Building 14 have?

Greymoor Way - Building 14 has 2 charging ports: 2 Level 2.

Does Greymoor Way - Building 14 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Greymoor Way - Building 14 have?

Greymoor Way - Building 14 has J1772 connectors.

Is Greymoor Way - Building 14 open to the public?

Yes. Greymoor Way - Building 14 is listed with public access, and its status is available.

Where is Greymoor Way - Building 14?

Greymoor Way - Building 14 is at 2608 Pipers Ct, Baldwinsville, NY 13027. Its coordinates are 43.18098, -76.30008.

More EV charging around Baldwinsville

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 223129, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Greymoor Way - Building 14, Baldwinsville, NY (AFDC station 223129)”, https://chargecensus.com/stations/new-york/greymoor-way-building-14-223129 (data as of October 12, 2026).