ChargeCensus

Goldstein Buick Cpe-2

Available

EV charging station in Albany, New York on the ChargePoint network — 1 DC fast. US DOE AFDC station 238515.

At a glance

Goldstein Buick Cpe-2 is a public EV charging station at 1673 Central Ave in Albany, New York, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Dec 21, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID238515
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 21, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1673 Central Ave
City
Albany
ZIP
12205
Coordinates
42.72240, -73.83812

Within ~15 km

Nearby charging

What kind of charging does Goldstein Buick Cpe-2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 75% below the New York average of 4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Goldstein Buick Cpe-2 compare with other stations in Albany?

Albany has 228 charging stations in the DOE registry with 870 ports, the 3rd-most of 757 cities and towns in New York. Goldstein Buick Cpe-2 accounts for under 1% of the charging ports in Albany. ChargePoint runs 125 stations in Albany. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Goldstein Buick Cpe-2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 21, 2022, one of 787 stations in New York with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Goldstein Buick Cpe-2 have?

Goldstein Buick Cpe-2 has 1 charging port: 1 DC fast.

Does Goldstein Buick Cpe-2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Goldstein Buick Cpe-2, with CHAdeMO and CCS connectors.

What connectors does Goldstein Buick Cpe-2 have?

Goldstein Buick Cpe-2 has CHAdeMO and CCS connectors.

Is Goldstein Buick Cpe-2 open to the public?

Yes. Goldstein Buick Cpe-2 is listed with public access, and its status is available.

Where is Goldstein Buick Cpe-2?

Goldstein Buick Cpe-2 is at 1673 Central Ave, Albany, NY 12205. Its coordinates are 42.72240, -73.83812.

More EV charging around Albany

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 238515, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Goldstein Buick Cpe-2, Albany, NY (AFDC station 238515)”, https://chargecensus.com/stations/new-york/goldstein-buick-cpe-2-238515 (data as of October 12, 2026).