ChargeCensus

Cole Group Highland 2

Available

EV charging station in Watervliet, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 260037.

At a glance

Cole Group Highland 2 is a public EV charging station at 10 Eastview Dr in Watervliet, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 28, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID260037
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 28, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
10 Eastview Dr
ZIP
12189
Coordinates
42.73596, -73.71844

Within ~15 km

Nearby charging

What kind of charging does Cole Group Highland 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Cole Group Highland 2 compare with other stations in Watervliet?

Watervliet has 30 charging stations in the DOE registry with 78 ports. Cole Group Highland 2 accounts for 3% of the charging ports in Watervliet. ChargePoint runs 24 stations in Watervliet. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Cole Group Highland 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 28, 2023, one of 822 stations in New York with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Cole Group Highland 2 have?

Cole Group Highland 2 has 2 charging ports: 2 Level 2.

Does Cole Group Highland 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Cole Group Highland 2 have?

Cole Group Highland 2 has J1772 connectors.

Is Cole Group Highland 2 open to the public?

Yes. Cole Group Highland 2 is listed with public access, and its status is available.

Where is Cole Group Highland 2?

Cole Group Highland 2 is at 10 Eastview Dr, Watervliet, NY 12189. Its coordinates are 42.73596, -73.71844.

More EV charging around Watervliet

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 260037, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cole Group Highland 2, Watervliet, NY (AFDC station 260037)”, https://chargecensus.com/stations/new-york/cole-group-highland-2-260037 (data as of October 12, 2026).