Building 3
AvailableEV charging station in Sleepy Hollow, New York on the Evoke network — 10 Level 2. US DOE AFDC station 459340.
At a glance
Building 3 is a public EV charging station at 305 Legend Drive in Sleepy Hollow, New York, on the Evoke network. It has 10 charging ports (10 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 13, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 459340 |
| Network | Evoke |
| Status | Available (E) |
| Access | Public |
| Facility | Multi-unit dwelling |
| Open date | May 13, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 305 Legend Drive
- City
- Sleepy Hollow
- State
- New York
- ZIP
- 10591
- Coordinates
- 41.08623, -73.86909
Within ~15 km
Nearby charging
- Parking Garage32 ports
Evoke · Available
- 25 N. Lexington Ave. Garage30 ports
Flash · Available
EV Connect · Available
- 70 Memorial28 ports
AmpUp · Available
- Parking Garage - 2524 ports
Evoke · Available
- Building 121 ports
Evoke · Available
What kind of charging does Building 3 offer?
Of its 10 ports, 10 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.5 times the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a multi-unit dwelling location.
How does Building 3 compare with other stations in Sleepy Hollow?
Sleepy Hollow has 4 charging stations in the DOE registry with 43 ports. Building 3 accounts for 23% of the charging ports in Sleepy Hollow. Evoke runs 3 stations in Sleepy Hollow. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Building 3?
Evoke operates 395 stations in the registry across 20 states, with 49 DC fast and 2,746 Level 2 ports in total. 269 of those stations are in New York, 4% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 13, 2022, one of 787 stations in New York with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Building 3 have?
Building 3 has 10 charging ports: 10 Level 2.
Does Building 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 10 ports are all Level 2.
What connectors does Building 3 have?
Building 3 has J1772 connectors.
Is Building 3 open to the public?
Yes. Building 3 is listed with public access, and its status is available.
Where is Building 3?
Building 3 is at 305 Legend Drive, Sleepy Hollow, NY 10591. Its coordinates are 41.08623, -73.86909.
More EV charging around Sleepy Hollow
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 459340, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Building 3, Sleepy Hollow, NY (AFDC station 459340)”, https://chargecensus.com/stations/new-york/building-3-459340 (data as of October 12, 2026).