Building 2 Exterior Front
AvailableEV charging station in Haverstraw, New York on the Evoke network — 5 Level 2. US DOE AFDC station 356896.
At a glance
Building 2 Exterior Front is a public EV charging station at 1100 Admirals Cove Boulevard in Haverstraw, New York, on the Evoke network. It has 5 charging ports (5 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 25, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 356896 |
| Network | Evoke |
| Status | Available (E) |
| Access | Public |
| Facility | Multi-unit dwelling |
| Open date | May 25, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1100 Admirals Cove Boulevard
- City
- Haverstraw
- State
- New York
- ZIP
- 10927
- Coordinates
- 41.19157, -73.95876
Within ~15 km
Nearby charging
Tesla Destination · Available
- Building 121 ports
Evoke · Available
- Hudson Harbor Condominiums20 ports
Synergev · Available
Tesla Destination · Available
- Prel Plaza - Tesla Destination20 ports
Tesla Destination · Available
Tesla Supercharger · Available
What kind of charging does Building 2 Exterior Front offer?
Of its 5 ports, 5 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% above the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a multi-unit dwelling location.
How does Building 2 Exterior Front compare with other stations in Haverstraw?
Haverstraw has 82 charging stations in the DOE registry with 155 ports, the 8th-most of 757 cities and towns in New York. Building 2 Exterior Front accounts for 3% of the charging ports in Haverstraw. Evoke runs 9 stations in Haverstraw. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.
Who operates Building 2 Exterior Front?
Evoke operates 395 stations in the registry across 20 states, with 49 DC fast and 2,746 Level 2 ports in total. 269 of those stations are in New York, 4% of the state's 6,091.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 25, 2023, one of 822 stations in New York with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Building 2 Exterior Front have?
Building 2 Exterior Front has 5 charging ports: 5 Level 2.
Does Building 2 Exterior Front have DC fast charging?
No. The registry lists no DC fast ports here; its 5 ports are all Level 2.
What connectors does Building 2 Exterior Front have?
Building 2 Exterior Front has J1772 connectors.
Is Building 2 Exterior Front open to the public?
Yes. Building 2 Exterior Front is listed with public access, and its status is available.
Where is Building 2 Exterior Front?
Building 2 Exterior Front is at 1100 Admirals Cove Boulevard, Haverstraw, NY 10927. Its coordinates are 41.19157, -73.95876.
More EV charging around Haverstraw
Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 356896, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Building 2 Exterior Front, Haverstraw, NY (AFDC station 356896)”, https://chargecensus.com/stations/new-york/building-2-exterior-front-356896 (data as of October 12, 2026).