ChargeCensus

Boiler ER Lot

Available

EV charging station in Buffalo, New York on the EV Connect network — 2 Level 2. US DOE AFDC station 202631.

At a glance

Boiler ER Lot is a public EV charging station at 2157 Main St Buffalo in Buffalo, New York, on the EV Connect network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 13, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID202631
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateDec 13, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
2157 Main St Buffalo
ZIP
14214
Coordinates
42.92779, -78.84743

Within ~15 km

Nearby charging

What kind of charging does Boiler ER Lot offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Boiler ER Lot compare with other stations in Buffalo?

Buffalo has 188 charging stations in the DOE registry with 549 ports, the 4th-most of 757 cities and towns in New York. Boiler ER Lot accounts for under 1% of the charging ports in Buffalo. EV Connect runs 15 stations in Buffalo. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Boiler ER Lot?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 222 of those stations are in New York, 4% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 13, 2021, one of 766 stations in New York with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Boiler ER Lot have?

Boiler ER Lot has 2 charging ports: 2 Level 2.

Does Boiler ER Lot have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Boiler ER Lot have?

Boiler ER Lot has J1772 connectors.

Is Boiler ER Lot open to the public?

Yes. Boiler ER Lot is listed with public access, and its status is available.

Where is Boiler ER Lot?

Boiler ER Lot is at 2157 Main St Buffalo, Buffalo, NY 14214. Its coordinates are 42.92779, -78.84743.

More EV charging around Buffalo

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 202631, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Boiler ER Lot, Buffalo, NY (AFDC station 202631)”, https://chargecensus.com/stations/new-york/boiler-er-lot-202631 (data as of October 12, 2026).