ChargeCensus

Beaver Lake Beaver Lake 1

Available

EV charging station in Baldwinsville, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 174740.

At a glance

Beaver Lake Beaver Lake 1 is a public EV charging station at Bog Trail in Baldwinsville, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID174740
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
Bog Trail
ZIP
13027
Coordinates
43.17985, -76.40259

Within ~15 km

Nearby charging

What kind of charging does Beaver Lake Beaver Lake 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Beaver Lake Beaver Lake 1 compare with other stations in Baldwinsville?

Baldwinsville has 31 charging stations in the DOE registry with 144 ports. Beaver Lake Beaver Lake 1 accounts for 1% of the charging ports in Baldwinsville. ChargePoint runs 4 stations in Baldwinsville. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Beaver Lake Beaver Lake 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 766 stations in New York with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Beaver Lake Beaver Lake 1 have?

Beaver Lake Beaver Lake 1 has 2 charging ports: 2 Level 2.

Does Beaver Lake Beaver Lake 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Beaver Lake Beaver Lake 1 have?

Beaver Lake Beaver Lake 1 has J1772 connectors.

Is Beaver Lake Beaver Lake 1 open to the public?

Yes. Beaver Lake Beaver Lake 1 is listed with public access, and its status is available.

Where is Beaver Lake Beaver Lake 1?

Beaver Lake Beaver Lake 1 is at Bog Trail, Baldwinsville, NY 13027. Its coordinates are 43.17985, -76.40259.

More EV charging around Baldwinsville

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 174740, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Beaver Lake Beaver Lake 1, Baldwinsville, NY (AFDC station 174740)”, https://chargecensus.com/stations/new-york/beaver-lake-beaver-lake-1-174740 (data as of October 12, 2026).