ChargeCensus

At Labs Atl Station 3

Available

EV charging station in Clifton Park, New York on the ChargePoint network — 2 Level 2. US DOE AFDC station 213550.

At a glance

At Labs Atl Station 3 is a public EV charging station at 22 Corporate Dr in Clifton Park, New York, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 7, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID213550
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 7, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
22 Corporate Dr
ZIP
12065
Coordinates
42.84811, -73.75829

Within ~15 km

Nearby charging

What kind of charging does At Labs Atl Station 3 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the New York average of 4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does At Labs Atl Station 3 compare with other stations in Clifton Park?

Clifton Park has 45 charging stations in the DOE registry with 250 ports, the 16th-most of 757 cities and towns in New York. At Labs Atl Station 3 accounts for under 1% of the charging ports in Clifton Park. ChargePoint runs 12 stations in Clifton Park. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates At Labs Atl Station 3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 7, 2022, one of 787 stations in New York with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does At Labs Atl Station 3 have?

At Labs Atl Station 3 has 2 charging ports: 2 Level 2.

Does At Labs Atl Station 3 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does At Labs Atl Station 3 have?

At Labs Atl Station 3 has J1772 connectors.

Is At Labs Atl Station 3 open to the public?

Yes. At Labs Atl Station 3 is listed with public access, and its status is available.

Where is At Labs Atl Station 3?

At Labs Atl Station 3 is at 22 Corporate Dr, Clifton Park, NY 12065. Its coordinates are 42.84811, -73.75829.

More EV charging around Clifton Park

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 213550, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “At Labs Atl Station 3, Clifton Park, NY (AFDC station 213550)”, https://chargecensus.com/stations/new-york/at-labs-atl-station-3-213550 (data as of October 12, 2026).