ChargeCensus

Advantage Toyota 1

Available

EV charging station in Valley Stream, New York on the ChargePoint network — 1 DC fast. US DOE AFDC station 310454.

At a glance

Advantage Toyota 1 is a public EV charging station at 400 Sunrise Hwy in Valley Stream, New York, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Sep 12, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID310454
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 12, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
400 Sunrise Hwy
City
Valley Stream
ZIP
11581
Coordinates
40.66327, -73.71502

Within ~15 km

Nearby charging

What kind of charging does Advantage Toyota 1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 75% below the New York average of 4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Advantage Toyota 1 compare with other stations in Valley Stream?

Valley Stream has 7 charging stations in the DOE registry with 54 ports. Advantage Toyota 1 accounts for 2% of the charging ports in Valley Stream. It is the only ChargePoint station in Valley Stream. Statewide, New York has 6,091 stations and 24,076 ports, the 2nd-largest station count of the 51 states and DC. The biggest station in New York, Sky Three Residences in Brooklyn, has 154 ports.

Who operates Advantage Toyota 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,557 of those stations are in New York, 42% of the state's 6,091.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 12, 2023, one of 822 stations in New York with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Advantage Toyota 1 have?

Advantage Toyota 1 has 1 charging port: 1 DC fast.

Does Advantage Toyota 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Advantage Toyota 1, with CHAdeMO and CCS connectors.

What connectors does Advantage Toyota 1 have?

Advantage Toyota 1 has CHAdeMO and CCS connectors.

Is Advantage Toyota 1 open to the public?

Yes. Advantage Toyota 1 is listed with public access, and its status is available.

Where is Advantage Toyota 1?

Advantage Toyota 1 is at 400 Sunrise Hwy, Valley Stream, NY 11581. Its coordinates are 40.66327, -73.71502.

More EV charging around Valley Stream

Working with New York charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 310454, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Advantage Toyota 1, Valley Stream, NY (AFDC station 310454)”, https://chargecensus.com/stations/new-york/advantage-toyota-1-310454 (data as of October 12, 2026).