Roosevelt Center - Municipal Building
AvailableEV charging station in Greenbelt, Maryland, not on a charging network — 2 DC fast. US DOE AFDC station 86712.
At a glance
Roosevelt Center - Municipal Building is a public EV charging station at 25 Crescent Rd in Greenbelt, Maryland, not attached to a charging network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Aug 9, 2017.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 86712 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Municipal government |
| Open date | Aug 9, 2017 |
| Last updated at source | Jul 27, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: Free
Within ~15 km
Nearby charging
- Fort Meade36 ports
Non-networked · Available
- Goddard Space Flight Center31 ports
Non-networked · Available
- DOE Forrestal24 ports
Non-networked · Available
- Regents Drive Garage - Series 820 ports
Blink · Available
- FDA White Oak Campus20 ports
Non-networked · Available
Non-networked · Available
What kind of charging does Roosevelt Center - Municipal Building offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector. Pricing as reported to the registry: “Free”. The site is listed as a municipal government location. It is flagged as workplace charging.
How does Roosevelt Center - Municipal Building compare with other stations in Greenbelt?
Greenbelt has 12 charging stations in the DOE registry with 69 ports. Roosevelt Center - Municipal Building accounts for 3% of the charging ports in Greenbelt. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Roosevelt Center - Municipal Building?
Roosevelt Center - Municipal Building is listed as non-networked: its chargers are not run through a charging-network account. Maryland has 306 non-networked stations, 16% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 9, 2017, one of 58 stations in Maryland with a 2017 open date. The station's record was last updated at the source on Jul 27, 2026.
Frequently asked questions
How many chargers does Roosevelt Center - Municipal Building have?
Roosevelt Center - Municipal Building has 2 charging ports: 2 DC fast.
Does Roosevelt Center - Municipal Building have DC fast charging?
Yes. The registry lists 2 DC fast ports at Roosevelt Center - Municipal Building, with CHAdeMO and CCS connectors.
What connectors does Roosevelt Center - Municipal Building have?
Roosevelt Center - Municipal Building has CHAdeMO and CCS connectors.
Is charging at Roosevelt Center - Municipal Building free?
Pricing as reported to the DOE registry: Free.
Is Roosevelt Center - Municipal Building open to the public?
Yes. Roosevelt Center - Municipal Building is listed with public access, and its status is available.
Where is Roosevelt Center - Municipal Building?
Roosevelt Center - Municipal Building is at 25 Crescent Rd, Greenbelt, MD 20770. Its coordinates are 39.00074, -76.87735.
More EV charging around Greenbelt
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 86712, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Roosevelt Center - Municipal Building, Greenbelt, MD (AFDC station 86712)”, https://chargecensus.com/stations/maryland/roosevelt-center-municipal-building-86712 (data as of October 12, 2026).