Greenbelt - Dpw Municipal 2
AvailableEV charging station in Greenbelt, Maryland on the ChargePoint network — 2 Level 2. US DOE AFDC station 445939.
At a glance
Greenbelt - Dpw Municipal 2 is a public EV charging station at 25 Crescent Road in Greenbelt, Maryland, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 19, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 445939 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 19, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Fort Meade36 ports
Non-networked · Available
- Goddard Space Flight Center31 ports
Non-networked · Available
- DOE Forrestal24 ports
Non-networked · Available
- Regents Drive Garage - Series 820 ports
Blink · Available
- FDA White Oak Campus20 ports
Non-networked · Available
Non-networked · Available
What kind of charging does Greenbelt - Dpw Municipal 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% below the Maryland average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Greenbelt - Dpw Municipal 2 compare with other stations in Greenbelt?
Greenbelt has 12 charging stations in the DOE registry with 69 ports. Greenbelt - Dpw Municipal 2 accounts for 3% of the charging ports in Greenbelt. ChargePoint runs 2 stations in Greenbelt. Statewide, Maryland has 1,866 stations and 6,365 ports, the 16th-largest station count of the 51 states and DC. The biggest station in Maryland, Aberdeen Proving Grounds in Aberdeen, has 36 ports.
Who operates Greenbelt - Dpw Municipal 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 659 of those stations are in Maryland, 35% of the state's 1,866.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 19, 2025, one of 415 stations in Maryland with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Greenbelt - Dpw Municipal 2 have?
Greenbelt - Dpw Municipal 2 has 2 charging ports: 2 Level 2.
Does Greenbelt - Dpw Municipal 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Greenbelt - Dpw Municipal 2 have?
Greenbelt - Dpw Municipal 2 has J1772 connectors.
Is Greenbelt - Dpw Municipal 2 open to the public?
Yes. Greenbelt - Dpw Municipal 2 is listed with public access, and its status is available.
Where is Greenbelt - Dpw Municipal 2?
Greenbelt - Dpw Municipal 2 is at 25 Crescent Road, Greenbelt, MD 20770. Its coordinates are 39.00073, -76.87735.
More EV charging around Greenbelt
Working with Maryland charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 445939, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Greenbelt - Dpw Municipal 2, Greenbelt, MD (AFDC station 445939)”, https://chargecensus.com/stations/maryland/greenbelt-dpw-municipal-2-445939 (data as of October 12, 2026).