Jmc EV 1 Mc 1
AvailableEV charging station in Columbus, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 347125.
At a glance
Jmc EV 1 Mc 1 is a public EV charging station at 6835 Midland Commons Blvd in Columbus, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 31, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 347125 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 31, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- City of Phenix City Site 16 ports
Loop · Available
- City of Phenix City Site 26 ports
Loop · Available
What kind of charging does Jmc EV 1 Mc 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Jmc EV 1 Mc 1 compare with other stations in Columbus?
Columbus has 65 charging stations in the DOE registry with 133 ports, the 4th-most of 243 cities and towns in Georgia. Jmc EV 1 Mc 1 accounts for 2% of the charging ports in Columbus. ChargePoint runs 42 stations in Columbus. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Jmc EV 1 Mc 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 31, 2024, one of 431 stations in Georgia with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Jmc EV 1 Mc 1 have?
Jmc EV 1 Mc 1 has 2 charging ports: 2 Level 2.
Does Jmc EV 1 Mc 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Jmc EV 1 Mc 1 have?
Jmc EV 1 Mc 1 has J1772 connectors.
Is Jmc EV 1 Mc 1 open to the public?
Yes. Jmc EV 1 Mc 1 is listed with public access, and its status is available.
Where is Jmc EV 1 Mc 1?
Jmc EV 1 Mc 1 is at 6835 Midland Commons Blvd, Columbus, GA 31909. Its coordinates are 32.54296, -84.87561.
More EV charging around Columbus
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 347125, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Jmc EV 1 Mc 1, Columbus, GA (AFDC station 347125)”, https://chargecensus.com/stations/georgia/jmc-ev-1-mc-1-347125 (data as of October 12, 2026).