ChargeCensus

City of Phenix City Site 1

Available

EV charging station in Phenix City, Alabama on the Loop network — 6 Level 2. US DOE AFDC station 398542.

At a glance

City of Phenix City Site 1 is a public EV charging station at 310 14th St in Phenix City, Alabama, on the Loop network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 20, 2024.

Total ports
6
DC fast
0
Level 2
6
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID398542
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateMar 20, 2024
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
310 14th St
City
Phenix City
State
Alabama
ZIP
36867
Coordinates
32.47308, -84.99867

Within ~15 km

Nearby charging

What kind of charging does City of Phenix City Site 1 offer?

Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 83% above the Alabama average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does City of Phenix City Site 1 compare with other stations in Phenix City?

Phenix City has 8 charging stations in the DOE registry with 18 ports, the 24th-most of 119 cities and towns in Alabama. City of Phenix City Site 1 accounts for 33% of the charging ports in Phenix City. Loop runs 2 stations in Phenix City. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.

Who operates City of Phenix City Site 1?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 11 of those stations are in Alabama, 2% of the state's 693.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 20, 2024, one of 144 stations in Alabama with a 2024 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does City of Phenix City Site 1 have?

City of Phenix City Site 1 has 6 charging ports: 6 Level 2.

Does City of Phenix City Site 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 6 ports are all Level 2.

What connectors does City of Phenix City Site 1 have?

City of Phenix City Site 1 has J1772 connectors.

Is City of Phenix City Site 1 open to the public?

Yes. City of Phenix City Site 1 is listed with public access, and its status is available.

Where is City of Phenix City Site 1?

City of Phenix City Site 1 is at 310 14th St, Phenix City, AL 36867. Its coordinates are 32.47308, -84.99867.

More EV charging around Phenix City

Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 398542, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City of Phenix City Site 1, Phenix City, AL (AFDC station 398542)”, https://chargecensus.com/stations/alabama/city-of-phenix-city-site-1-398542 (data as of October 12, 2026).