Georgia Power Tybee Island L2
AvailableEV charging station in Tybee Island, Georgia on the ChargePoint network — 2 Level 2. US DOE AFDC station 226072.
At a glance
Georgia Power Tybee Island L2 is a public EV charging station at 31 Meddin Dr in Tybee Island, Georgia, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 23, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 226072 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 23, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 31 Meddin Dr
- City
- Tybee Island
- State
- Georgia
- ZIP
- 31328
- Coordinates
- 32.02120, -80.84403
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Destination · Available
- Starbucks Store #652392 ports
ChargePoint · Available
- Ocean Oak Station 11 ports
ChargePoint · Available
- Southern Most Comfort1 ports
ChargeLab · Available
- Hilton Head Health1 ports
Non-networked · Available
What kind of charging does Georgia Power Tybee Island L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Georgia Power Tybee Island L2 compare with other stations in Tybee Island?
Tybee Island has 3 charging stations in the DOE registry with 4 ports. Georgia Power Tybee Island L2 accounts for 50% of the charging ports in Tybee Island. ChargePoint runs 2 stations in Tybee Island. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Georgia Power Tybee Island L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 23, 2022, one of 219 stations in Georgia with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Georgia Power Tybee Island L2 have?
Georgia Power Tybee Island L2 has 2 charging ports: 2 Level 2.
Does Georgia Power Tybee Island L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Georgia Power Tybee Island L2 have?
Georgia Power Tybee Island L2 has J1772 connectors.
Is Georgia Power Tybee Island L2 open to the public?
Yes. Georgia Power Tybee Island L2 is listed with public access, and its status is available.
Where is Georgia Power Tybee Island L2?
Georgia Power Tybee Island L2 is at 31 Meddin Dr, Tybee Island, GA 31328. Its coordinates are 32.02120, -80.84403.
More EV charging around Tybee Island
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 226072, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Georgia Power Tybee Island L2, Tybee Island, GA (AFDC station 226072)”, https://chargecensus.com/stations/georgia/georgia-power-tybee-island-l2-226072 (data as of October 12, 2026).