Starbucks Store #65239
AvailableEV charging station in Hilton Head Island, South Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 440773.
At a glance
Starbucks Store #65239 is a public EV charging station at 16 Pope Ave in Hilton Head Island, South Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 8, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 440773 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 8, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 16 Pope Ave
- State
- South Carolina
- ZIP
- 29928
- Coordinates
- 32.15160, -80.76017
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Wdw Hilton Head 12 ports
ChargePoint · Available
Tesla Destination · Available
ChargePoint · Available
What kind of charging does Starbucks Store #65239 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 36% below the South Carolina average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Starbucks Store #65239 compare with other stations in Hilton Head Island?
Hilton Head Island has 18 charging stations in the DOE registry with 39 ports, the 11th-most of 130 cities and towns in South Carolina. Starbucks Store #65239 accounts for 5% of the charging ports in Hilton Head Island. ChargePoint runs 5 stations in Hilton Head Island. Statewide, South Carolina has 788 stations and 2,463 ports, the 26th-largest station count of the 51 states and DC. The biggest station in South Carolina, Manning, SC - Tesla Supercharger in Manning, has 60 ports.
Who operates Starbucks Store #65239?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 268 of those stations are in South Carolina, 34% of the state's 788.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 8, 2025, one of 120 stations in South Carolina with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Starbucks Store #65239 have?
Starbucks Store #65239 has 2 charging ports: 2 Level 2.
Does Starbucks Store #65239 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Starbucks Store #65239 have?
Starbucks Store #65239 has J1772 connectors.
Is Starbucks Store #65239 open to the public?
Yes. Starbucks Store #65239 is listed with public access, and its status is available.
Where is Starbucks Store #65239?
Starbucks Store #65239 is at 16 Pope Ave, Hilton Head Island, SC 29928. Its coordinates are 32.15160, -80.76017.
More EV charging around Hilton Head Island
Working with South Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 440773, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Starbucks Store #65239, Hilton Head Island, SC (AFDC station 440773)”, https://chargecensus.com/stations/south-carolina/starbucks-store-65239-440773 (data as of October 12, 2026).