ChargeCensus

Georgia Power Perrydc1

Available

EV charging station in Perry, Georgia on the ChargePoint network — 1 DC fast. US DOE AFDC station 191767.

At a glance

Georgia Power Perrydc1 is a public EV charging station at 301 AG Village Blvd in Perry, Georgia, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jul 3, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID191767
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 3, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
301 AG Village Blvd
City
Perry
State
Georgia
ZIP
31069
Coordinates
32.43430, -83.76059

Within ~15 km

Nearby charging

What kind of charging does Georgia Power Perrydc1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Georgia Power Perrydc1 compare with other stations in Perry?

Perry has 8 charging stations in the DOE registry with 23 ports. Georgia Power Perrydc1 accounts for 4% of the charging ports in Perry. ChargePoint runs 5 stations in Perry. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Georgia Power Perrydc1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 3, 2021, one of 391 stations in Georgia with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Georgia Power Perrydc1 have?

Georgia Power Perrydc1 has 1 charging port: 1 DC fast.

Does Georgia Power Perrydc1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Georgia Power Perrydc1, with CHAdeMO and CCS connectors.

What connectors does Georgia Power Perrydc1 have?

Georgia Power Perrydc1 has CHAdeMO and CCS connectors.

Is Georgia Power Perrydc1 open to the public?

Yes. Georgia Power Perrydc1 is listed with public access, and its status is available.

Where is Georgia Power Perrydc1?

Georgia Power Perrydc1 is at 301 AG Village Blvd, Perry, GA 31069. Its coordinates are 32.43430, -83.76059.

More EV charging around Perry

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 191767, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Georgia Power Perrydc1, Perry, GA (AFDC station 191767)”, https://chargecensus.com/stations/georgia/georgia-power-perrydc1-191767 (data as of October 12, 2026).