Cadia Warner Robins
AvailableEV charging station in Warner Robins, Georgia on the Blink network — 2 Level 2. US DOE AFDC station 309349.
At a glance
Cadia Warner Robins is a public EV charging station at 91 Bass Road in Warner Robins, Georgia, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 27, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 309349 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 27, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 91 Bass Road
- City
- Warner Robins
- State
- Georgia
- ZIP
- 31088
- Coordinates
- 32.58373, -83.66482
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Perry, GA - Tesla Supercharger16 ports
Tesla Supercharger · Available
Tesla Destination · Available
EnviroSpark · Available
Tesla Destination · Available
- Jeff Smith Ford4 ports
Ford Charge · Available
What kind of charging does Cadia Warner Robins offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 42% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cadia Warner Robins compare with other stations in Warner Robins?
Warner Robins has 18 charging stations in the DOE registry with 42 ports. Cadia Warner Robins accounts for 5% of the charging ports in Warner Robins. Blink runs 2 stations in Warner Robins. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Cadia Warner Robins?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 201 of those stations are in Georgia, 8% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 27, 2022, one of 219 stations in Georgia with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cadia Warner Robins have?
Cadia Warner Robins has 2 charging ports: 2 Level 2.
Does Cadia Warner Robins have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cadia Warner Robins have?
Cadia Warner Robins has J1772 connectors.
Is Cadia Warner Robins open to the public?
Yes. Cadia Warner Robins is listed with public access, and its status is available.
Where is Cadia Warner Robins?
Cadia Warner Robins is at 91 Bass Road, Warner Robins, GA 31088. Its coordinates are 32.58373, -83.66482.
More EV charging around Warner Robins
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 309349, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cadia Warner Robins, Warner Robins, GA (AFDC station 309349)”, https://chargecensus.com/stations/georgia/cadia-warner-robins-309349 (data as of October 12, 2026).