Ccgvt Csn-01790778
AvailableEV charging station in Columbus, Georgia on the ChargePoint network — 1 Level 2. US DOE AFDC station 387909.
At a glance
Ccgvt Csn-01790778 is a public EV charging station at 5089 Cooper Creek Rd in Columbus, Georgia, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 18, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 387909 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 18, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
Tesla Supercharger · Available
Tesla Destination · Available
- City of Phenix City Site 16 ports
Loop · Available
- City of Phenix City Site 26 ports
Loop · Available
What kind of charging does Ccgvt Csn-01790778 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ccgvt Csn-01790778 compare with other stations in Columbus?
Columbus has 65 charging stations in the DOE registry with 133 ports, the 4th-most of 243 cities and towns in Georgia. Ccgvt Csn-01790778 accounts for under 1% of the charging ports in Columbus. ChargePoint runs 42 stations in Columbus. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates Ccgvt Csn-01790778?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2025, one of 504 stations in Georgia with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ccgvt Csn-01790778 have?
Ccgvt Csn-01790778 has 1 charging port: 1 Level 2.
Does Ccgvt Csn-01790778 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Ccgvt Csn-01790778 have?
Ccgvt Csn-01790778 has J1772 connectors.
Is Ccgvt Csn-01790778 open to the public?
Yes. Ccgvt Csn-01790778 is listed with public access, and its status is available.
Where is Ccgvt Csn-01790778?
Ccgvt Csn-01790778 is at 5089 Cooper Creek Rd, Columbus, GA 31909. Its coordinates are 32.55651, -84.92386.
More EV charging around Columbus
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 387909, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ccgvt Csn-01790778, Columbus, GA (AFDC station 387909)”, https://chargecensus.com/stations/georgia/ccgvt-csn-01790778-387909 (data as of October 12, 2026).