ChargeCensus

Ampcap 1123 Mcdonoug 2

Available

EV charging station in McDonough, Georgia on the ChargePoint network — 1 Level 2. US DOE AFDC station 182890.

At a glance

Ampcap 1123 Mcdonoug 2 is a public EV charging station at 1570 GA-20 in McDonough, Georgia, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID182890
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1570 GA-20
State
Georgia
ZIP
30253
Coordinates
33.42080, -84.19115

Within ~15 km

Nearby charging

What kind of charging does Ampcap 1123 Mcdonoug 2 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ampcap 1123 Mcdonoug 2 compare with other stations in McDonough?

McDonough has 21 charging stations in the DOE registry with 74 ports, the 24th-most of 243 cities and towns in Georgia. Ampcap 1123 Mcdonoug 2 accounts for 1% of the charging ports in McDonough. ChargePoint runs 8 stations in McDonough. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.

Who operates Ampcap 1123 Mcdonoug 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,431 of those stations are in Georgia, 56% of the state's 2,545.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 391 stations in Georgia with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ampcap 1123 Mcdonoug 2 have?

Ampcap 1123 Mcdonoug 2 has 1 charging port: 1 Level 2.

Does Ampcap 1123 Mcdonoug 2 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Ampcap 1123 Mcdonoug 2 have?

Ampcap 1123 Mcdonoug 2 has J1772 connectors.

Is Ampcap 1123 Mcdonoug 2 open to the public?

Yes. Ampcap 1123 Mcdonoug 2 is listed with public access, and its status is available.

Where is Ampcap 1123 Mcdonoug 2?

Ampcap 1123 Mcdonoug 2 is at 1570 GA-20, McDonough, GA 30253. Its coordinates are 33.42080, -84.19115.

More EV charging around McDonough

Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 182890, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ampcap 1123 Mcdonoug 2, McDonough, GA (AFDC station 182890)”, https://chargecensus.com/stations/georgia/ampcap-1123-mcdonoug-2-182890 (data as of October 12, 2026).