City of McDonough City Hall
AvailableEV charging station in McDonough, Georgia on the EnviroSpark network — 6 Level 2. US DOE AFDC station 439326.
At a glance
City of McDonough City Hall is a public EV charging station at 136 Keys Ferry St in McDonough, Georgia, on the EnviroSpark network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 31, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 439326 |
| Network | EnviroSpark |
| Status | Available (E) |
| Access | Public |
| Facility | Municipal government |
| Open date | Aug 31, 2023 |
| Last updated at source | Mar 31, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.40 per kWh
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Locust Grove MB.HPC10 ports
Mercedes-Benz HPC · Available
- Walmart EV Charging8 ports
Walmart · Available
Tesla Destination · Available
Electric Era · Available
What kind of charging does City of McDonough City Hall offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 74% above the Georgia average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.40 per kWh”. The site is listed as a municipal government location.
How does City of McDonough City Hall compare with other stations in McDonough?
McDonough has 21 charging stations in the DOE registry with 74 ports, the 24th-most of 243 cities and towns in Georgia. City of McDonough City Hall accounts for 8% of the charging ports in McDonough. It is the only EnviroSpark station in McDonough. Statewide, Georgia has 2,545 stations and 8,765 ports, the 8th-largest station count of the 51 states and DC. The biggest station in Georgia, South Atlanta Ga Sdc in Atlanta, has 236 ports.
Who operates City of McDonough City Hall?
EnviroSpark operates 235 stations in the registry across 24 states, with 32 DC fast and 1,239 Level 2 ports in total. 121 of those stations are in Georgia, 5% of the state's 2,545.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 31, 2023, one of 308 stations in Georgia with a 2023 open date. The station's record was last updated at the source on Mar 31, 2026.
Frequently asked questions
How many chargers does City of McDonough City Hall have?
City of McDonough City Hall has 6 charging ports: 6 Level 2.
Does City of McDonough City Hall have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does City of McDonough City Hall have?
City of McDonough City Hall has J1772 connectors.
Is charging at City of McDonough City Hall free?
Pricing as reported to the DOE registry: $0.40 per kWh.
Is City of McDonough City Hall open to the public?
Yes. City of McDonough City Hall is listed with public access, and its status is available.
Where is City of McDonough City Hall?
City of McDonough City Hall is at 136 Keys Ferry St, McDonough, GA 30253. Its coordinates are 33.44727, -84.14260.
More EV charging around McDonough
Working with Georgia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 439326, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “City of McDonough City Hall, McDonough, GA (AFDC station 439326)”, https://chargecensus.com/stations/georgia/city-of-mcdonough-city-hall-439326 (data as of October 12, 2026).