ChargeCensus

Tides At River Station 11

Available

EV charging station in Miami, Florida on the ChargePoint network — 1 Level 2. US DOE AFDC station 465409.

At a glance

Tides At River Station 11 is a public EV charging station at 304 NW S River Dr in Miami, Florida, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 1, 2026.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID465409
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 1, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
304 NW S River Dr
City
Miami
State
Florida
ZIP
33125
Coordinates
25.79225, -80.24091

Within ~15 km

Nearby charging

What kind of charging does Tides At River Station 11 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 72% below the Florida average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Tides At River Station 11 compare with other stations in Miami?

Miami has 438 charging stations in the DOE registry with 1,562 ports, the most of 381 cities and towns in Florida. Tides At River Station 11 accounts for under 1% of the charging ports in Miami. ChargePoint runs 233 stations in Miami. Statewide, Florida has 4,858 stations and 17,076 ports, the 4th-largest station count of the 51 states and DC. The biggest station in Florida, Panama City Fl Sdc in Panama City, has 92 ports.

Who operates Tides At River Station 11?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,084 of those stations are in Florida, 43% of the state's 4,858.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 1, 2026, one of 554 stations in Florida with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Tides At River Station 11 have?

Tides At River Station 11 has 1 charging port: 1 Level 2.

Does Tides At River Station 11 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Tides At River Station 11 have?

Tides At River Station 11 has J1772 connectors.

Is Tides At River Station 11 open to the public?

Yes. Tides At River Station 11 is listed with public access, and its status is available.

Where is Tides At River Station 11?

Tides At River Station 11 is at 304 NW S River Dr, Miami, FL 33125. Its coordinates are 25.79225, -80.24091.

More EV charging around Miami

Working with Florida charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 465409, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Tides At River Station 11, Miami, FL (AFDC station 465409)”, https://chargecensus.com/stations/florida/tides-at-river-station-11-465409 (data as of October 12, 2026).