Litchfield Ford Station 2
AvailableEV charging station in Litchfield, Connecticut on the ChargePoint network — 2 Level 2. US DOE AFDC station 316214.
At a glance
Litchfield Ford Station 2 is a public EV charging station at 439 Bantam Road in Litchfield, Connecticut, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 28, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 316214 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 28, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 439 Bantam Road
- City
- Litchfield
- State
- Connecticut
- ZIP
- 06759
- Coordinates
- 41.73721, -73.21538
Within ~15 km
Nearby charging
- Wittmann USA, Inc /Bas35996 ports
AmpUp · Available
- Fuel Cell Energy5 ports
AmpUp · Available
- Deep West District Upper Lot5 ports
AmpUp · Available
- C.H. Nickerson4 ports
Loop · Available
- Northwest Hills Cadillac4 ports
EV Connect · Available
Tesla Destination · Available
What kind of charging does Litchfield Ford Station 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Litchfield Ford Station 2 compare with other stations in Litchfield?
Litchfield has 17 charging stations in the DOE registry with 23 ports. Litchfield Ford Station 2 accounts for 9% of the charging ports in Litchfield. ChargePoint runs 17 stations in Litchfield. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.
Who operates Litchfield Ford Station 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 28, 2023, one of 452 stations in Connecticut with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Litchfield Ford Station 2 have?
Litchfield Ford Station 2 has 2 charging ports: 2 Level 2.
Does Litchfield Ford Station 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Litchfield Ford Station 2 have?
Litchfield Ford Station 2 has J1772 connectors.
Is Litchfield Ford Station 2 open to the public?
Yes. Litchfield Ford Station 2 is listed with public access, and its status is available.
Where is Litchfield Ford Station 2?
Litchfield Ford Station 2 is at 439 Bantam Road, Litchfield, CT 06759. Its coordinates are 41.73721, -73.21538.
More EV charging around Litchfield
Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 316214, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Litchfield Ford Station 2, Litchfield, CT (AFDC station 316214)”, https://chargecensus.com/stations/connecticut/litchfield-ford-station-2-316214 (data as of October 12, 2026).