ChargeCensus

Litchfield Ford Power Link 3

Available

EV charging station in Litchfield, Connecticut on the ChargePoint network — 2 DC fast. US DOE AFDC station 325404.

At a glance

Litchfield Ford Power Link 3 is a public EV charging station at 439 Bantam Road in Litchfield, Connecticut, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jan 13, 2024.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID325404
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 13, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
439 Bantam Road
ZIP
06759
Coordinates
41.73718, -73.21527

Within ~15 km

Nearby charging

What kind of charging does Litchfield Ford Power Link 3 offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 35% below the Connecticut average of 3.1 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Litchfield Ford Power Link 3 compare with other stations in Litchfield?

Litchfield has 17 charging stations in the DOE registry with 23 ports. Litchfield Ford Power Link 3 accounts for 9% of the charging ports in Litchfield. ChargePoint runs 17 stations in Litchfield. Statewide, Connecticut has 1,807 stations and 5,527 ports, the 18th-largest station count of the 51 states and DC. The biggest station in Connecticut, 18 Dock St in Stamford, has 46 ports.

Who operates Litchfield Ford Power Link 3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 677 of those stations are in Connecticut, 37% of the state's 1,807.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 13, 2024, one of 426 stations in Connecticut with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Litchfield Ford Power Link 3 have?

Litchfield Ford Power Link 3 has 2 charging ports: 2 DC fast.

Does Litchfield Ford Power Link 3 have DC fast charging?

Yes. The registry lists 2 DC fast ports at Litchfield Ford Power Link 3, with CCS connectors.

What connectors does Litchfield Ford Power Link 3 have?

Litchfield Ford Power Link 3 has CCS connectors.

Is Litchfield Ford Power Link 3 open to the public?

Yes. Litchfield Ford Power Link 3 is listed with public access, and its status is available.

Where is Litchfield Ford Power Link 3?

Litchfield Ford Power Link 3 is at 439 Bantam Road, Litchfield, CT 06759. Its coordinates are 41.73718, -73.21527.

More EV charging around Litchfield

Working with Connecticut charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 325404, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Litchfield Ford Power Link 3, Litchfield, CT (AFDC station 325404)”, https://chargecensus.com/stations/connecticut/litchfield-ford-power-link-3-325404 (data as of October 12, 2026).