K1 Speed K1 Speed 2
AvailableEV charging station in Thornton, Colorado on the ChargePoint network — 1 Level 2. US DOE AFDC station 458211.
At a glance
K1 Speed K1 Speed 2 is a public EV charging station at 16059 Grant St in Thornton, Colorado, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Apr 24, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458211 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 24, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Walmart EV Charging16 ports
Walmart · Available
- Sill-Terhar Ford10 ports
Blink · Available
- The Grove Thornton MB.HPC10 ports
Mercedes-Benz HPC · Available
Tesla Supercharger · Available
- Elevations Credit Union8 ports
Non-networked · Available
What kind of charging does K1 Speed K1 Speed 2 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 65% below the Colorado average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector.
How does K1 Speed K1 Speed 2 compare with other stations in Thornton?
Thornton has 43 charging stations in the DOE registry with 112 ports, the 20th-most of 204 cities and towns in Colorado. K1 Speed K1 Speed 2 accounts for under 1% of the charging ports in Thornton. ChargePoint runs 29 stations in Thornton. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates K1 Speed K1 Speed 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 24, 2026, one of 432 stations in Colorado with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does K1 Speed K1 Speed 2 have?
K1 Speed K1 Speed 2 has 1 charging port: 1 Level 2.
Does K1 Speed K1 Speed 2 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does K1 Speed K1 Speed 2 have?
K1 Speed K1 Speed 2 has J1772 and NACS (Tesla) connectors.
Is K1 Speed K1 Speed 2 open to the public?
Yes. K1 Speed K1 Speed 2 is listed with public access, and its status is available.
Where is K1 Speed K1 Speed 2?
K1 Speed K1 Speed 2 is at 16059 Grant St, Thornton, CO 80023. Its coordinates are 39.98736, -104.98399.
More EV charging around Thornton
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458211, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “K1 Speed K1 Speed 2, Thornton, CO (AFDC station 458211)”, https://chargecensus.com/stations/colorado/k1-speed-k1-speed-2-458211 (data as of October 12, 2026).