ChargeCensus

Sill-Terhar Ford

Available

EV charging station in Broomfield, Colorado on the Blink network — 6 DC fast · 4 Level 2. US DOE AFDC station 309691.

At a glance

Sill-Terhar Ford is a public EV charging station at 150 Alter Street in Broomfield, Colorado, on the Blink network. It has 10 charging ports (6 DC fast · 4 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Aug 30, 2023.

Total ports
10
DC fast
6
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID309691
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateAug 30, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
150 Alter Street
ZIP
80020
Coordinates
39.91869, -105.09257

Within ~15 km

Nearby charging

What kind of charging does Sill-Terhar Ford offer?

Of its 10 ports, 6 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.5 times the Colorado average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does Sill-Terhar Ford compare with other stations in Broomfield?

Broomfield has 89 charging stations in the DOE registry with 213 ports, the 6th-most of 204 cities and towns in Colorado. Sill-Terhar Ford accounts for 5% of the charging ports in Broomfield. Blink runs 6 stations in Broomfield. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates Sill-Terhar Ford?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 219 of those stations are in Colorado, 7% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 30, 2023, one of 410 stations in Colorado with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Sill-Terhar Ford have?

Sill-Terhar Ford has 10 charging ports: 6 DC fast · 4 Level 2.

Does Sill-Terhar Ford have DC fast charging?

Yes. The registry lists 6 DC fast ports at Sill-Terhar Ford, with CCS connectors.

What connectors does Sill-Terhar Ford have?

Sill-Terhar Ford has J1772 and CCS connectors.

Is Sill-Terhar Ford open to the public?

Yes. Sill-Terhar Ford is listed with public access, and its status is available.

Where is Sill-Terhar Ford?

Sill-Terhar Ford is at 150 Alter Street, Broomfield, CO 80020. Its coordinates are 39.91869, -105.09257.

More EV charging around Broomfield

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 309691, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sill-Terhar Ford, Broomfield, CO (AFDC station 309691)”, https://chargecensus.com/stations/colorado/sill-terhar-ford-309691 (data as of October 12, 2026).