Flexspacedepot Charger 3
AvailableEV charging station in Broomfield, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 332323.
At a glance
Flexspacedepot Charger 3 is a public EV charging station at 1001 Depot Hill Rd in Broomfield, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 16, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 332323 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 16, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1001 Depot Hill Rd
- City
- Broomfield
- State
- Colorado
- ZIP
- 80020
- Coordinates
- 39.92941, -105.09245
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Walmart EV Charging16 ports
Walmart · Available
- Sill-Terhar Ford10 ports
Blink · Available
- The Grove Thornton MB.HPC10 ports
Mercedes-Benz HPC · Available
What kind of charging does Flexspacedepot Charger 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Flexspacedepot Charger 3 compare with other stations in Broomfield?
Broomfield has 89 charging stations in the DOE registry with 213 ports, the 6th-most of 204 cities and towns in Colorado. Flexspacedepot Charger 3 accounts for under 1% of the charging ports in Broomfield. ChargePoint runs 72 stations in Broomfield. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Flexspacedepot Charger 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 16, 2024, one of 381 stations in Colorado with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Flexspacedepot Charger 3 have?
Flexspacedepot Charger 3 has 2 charging ports: 2 Level 2.
Does Flexspacedepot Charger 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Flexspacedepot Charger 3 have?
Flexspacedepot Charger 3 has J1772 connectors.
Is Flexspacedepot Charger 3 open to the public?
Yes. Flexspacedepot Charger 3 is listed with public access, and its status is available.
Where is Flexspacedepot Charger 3?
Flexspacedepot Charger 3 is at 1001 Depot Hill Rd, Broomfield, CO 80020. Its coordinates are 39.92941, -105.09245.
More EV charging around Broomfield
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 332323, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Flexspacedepot Charger 3, Broomfield, CO (AFDC station 332323)”, https://chargecensus.com/stations/colorado/flexspacedepot-charger-3-332323 (data as of October 12, 2026).