Core Sedalia Dc_justicectr_n
AvailableEV charging station in Castle Rock, Colorado on the ChargePoint network — 2 Level 2. US DOE AFDC station 387381.
At a glance
Core Sedalia Dc_justicectr_n is a public EV charging station at 4000 Justice Way in Castle Rock, Colorado, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 7, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 387381 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 7, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4000 Justice Way
- City
- Castle Rock
- State
- Colorado
- ZIP
- 80109
- Coordinates
- 39.40336, -104.86574
Within ~15 km
Nearby charging
- AMLI Ridgegate40 ports
Loop · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Electrify America · Available
- Camden Lincoln Station8 ports
Loop · Available
- Lone Tree - CO055-18 ports
Blink · Available
What kind of charging does Core Sedalia Dc_justicectr_n offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Core Sedalia Dc_justicectr_n compare with other stations in Castle Rock?
Castle Rock has 20 charging stations in the DOE registry with 64 ports. Core Sedalia Dc_justicectr_n accounts for 3% of the charging ports in Castle Rock. ChargePoint runs 12 stations in Castle Rock. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.
Who operates Core Sedalia Dc_justicectr_n?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 2,095 of those stations are in Colorado, 66% of the state's 3,163.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 7, 2025, one of 568 stations in Colorado with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Core Sedalia Dc_justicectr_n have?
Core Sedalia Dc_justicectr_n has 2 charging ports: 2 Level 2.
Does Core Sedalia Dc_justicectr_n have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Core Sedalia Dc_justicectr_n have?
Core Sedalia Dc_justicectr_n has J1772 connectors.
Is Core Sedalia Dc_justicectr_n open to the public?
Yes. Core Sedalia Dc_justicectr_n is listed with public access, and its status is available.
Where is Core Sedalia Dc_justicectr_n?
Core Sedalia Dc_justicectr_n is at 4000 Justice Way, Castle Rock, CO 80109. Its coordinates are 39.40336, -104.86574.
More EV charging around Castle Rock
Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 387381, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Core Sedalia Dc_justicectr_n, Castle Rock, CO (AFDC station 387381)”, https://chargecensus.com/stations/colorado/core-sedalia-dc-justicectr-n-387381 (data as of October 12, 2026).